Detailed Engineering Survey, DCP Test , Design of Roads, Concise IEE study and DPR Preparation, Contract No.:6/DPR/337123
Feasibility study, Detail Engineering Design and Construction Supervision of the Urban and Environmental Improvement Project (UEIP), Dhulikhel Municipality
Detailed Engineering Design Review and Construction Supervision of Melamchi Water Supply Sub-Project -2
Detailed Engineering Design and Construction Supervision of Bagmati Area Physical Infrastructure Development Project,
Detailed Engineering Design of Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP)
Detailed Engineering Survey, DCP Test , Design of Roads, Concise IEE study and DPR Preparation
Detailed Engineering Survey, Detailed Design of Roads and Report Preparation
Detailed Engineering Survey Design of Road and Report Preparation (DPR) of Ganesh Chowk
Urban Road Improvement/upgrading in four towns and Road Improvement/Upgrading in two strategic roads
(i). Parasi – Tribeni Section of Bhairahawa – Tribeni Road (26.51 Km), (ii). Tribeni- Dumkibas Section of Tribeni- Dumkibas- Gaidakot Road (21.62 Km),(iii).Ridi- Tamghas Section (39.93 Km) to two lane standard;
Second Town Integrated Urban Environmental Improvement Project STIUEIP)
Kalyankot Gobardiha Gadhwa Rajpur Gothuwa, Dang (78.27 km) and Gothuwa Kumbar Betahani Nepalgunj Kiran Nala, Banke (90 km)
Ganesh Chowk – Amarpur Dada- Sibuwa – Majhitar – Mulghat (Kabeli Corridor Midhill), Panchathar, Dhankuta (104 KM)
Bagmati Area Physical Infrastructure Development Project, Kathmandu Metropolitan City.