Inner Page Header Image

Project Detail

Perform Topographical Survey, Traffic Study, Soil Investigation and Detailed Design and Cost Estimate of Grade Separated Road Structure at Various Intersections along Kathmandu Ring Road (Integrated Satdobato-Imadol Chowk, Gwarko & Ekantakuna), (Contract No.: QRDC-R/2076.77-01)

 

Project Description

·   Identification of Data Needs and Collection of Maps, plans, topographical features, Environmental Data and Social Data.

·   Traffic Studies which includes Road Inventory Survey, Classified Traffic Volume Survey, Turning Movement Count Survey, Roadside Origin-Destination Survey, Intersection Volume -Delay Survey, Pedestrian Volume Survey.

·   Topographical Survey and Investigation.

·   Geological Studies & Laboratory Tests.

·   Traffic & Transport Planning.

     Detailed Design, Cost Estimation and Report Preparation.

·   Identification of Data Needs and Collection of Maps, plans, topographical features, Environmental Data and Social Data.

·   Traffic Studies which includes Road Inventory Survey, Classified Traffic Volume Survey, Turning Movement Count Survey, Roadside Origin-Destination Survey, Intersection Volume -Delay Survey, Pedestrian Volume Survey.

·   Topographical Survey and Investigation.

·   Geological Studies & Laboratory Tests.

·   Traffic & Transport Planning.

     Detailed Design, Cost Estimation and Report Preparation.

-->