Project Detail

Design and Construction Supervision for Second Town Integrated Urban Environmental Improvement Project STIUEIP). ADB Loan No – 260 NEP (SF), l Nepal

 

Project Description

i) Storm Water Drains:

Masterplan, Detail Survey and Design of 37 km length brick masonry and R.C.C. storm water drains with outlet structures and syphon crossings works etc.

ii) Sewer Lines:

Masterplan, Detail Survey and Design of 64 km length spigot type of R.C.C. hume pipe (16.8 km) and HDPE pipe (47.2 km) trunk mains and secondary sewers works (sewer size 200 dia. to 1000 dia.) construction with Manholes, (2019 nos.), sewer inlets (3766 nos.), house connection (5930 nos.), etc.

iii) Wastewater Treatment Plant:

Detail Survey and Design of214 mld capacity pumping station, collection chamber (3 Nos.), bar screen (1 no.), oil & grease chamber (1 no.), grit chamber (1 no.), anaerobic ponds (3 Nos.) facultative ponds (3 Nos.), sludge drying beds, outfall structure, workshop, office cum-laboratory building, guard quarter, generator house, electricity transmission line, submersible pump and site development works etc.

iv) Road upgrading and Improvements:

Detail Survey and Design of 65 km length of bituminous road having width of 4m to 14m including pavement design.