Design and Supervision and Management Consultant (DSC04) for Detailed Design Engineering including preparation of Tender Document and Construction Supervision of Centralized Wastewater Treatment Plants (WWTP), Intercepting Sewer Lines, Neighborhood Sewer Network and Decentralized Wastewater Treatment Systems (DwaTS) in Kathmandu Valley. (Funded by ADB)

 

Project Description

·    Preparation of DPR, Cost Estimate and Bidding Document of Design Build and Operate contract for 4 numbers of Wastewater Treatment Plants is completed: 32.4 MLD of Guheshwori WWTP at Kathmandu Metropolitan city, 14.2 MLD  of   Sallaghari WWTP at Bhaktapur Municipality, 17.5 MLD of Kodku WWTP at Lalitpur Sub- Metropolitan City and 37 MLD of Dhobi hat WWTP at Lalitpur Sub – Metropolitan   City   with   Total   Estimated Cost of 95.69 million US$

·   Preparation of Detailed Design, Cost Estimate and Bidding Documents for Construction Package of Interceptor Sewer Laying Along Hanumante and Manohara River of about 37 km of interceptor length varying from 400mm dia to 1500mm dia with total estimated cost of 23.107 million US$ in completed (The packages are under the bidding process)

·   Preparation of Design and Bidding Documents for other component of the project is undergoing.

The updating of IEE documents are resettlement plan document are prepared.

·    Preparation of DPR, Cost Estimate and Bidding Document of Design Build and Operate contract for 4 numbers of Wastewater Treatment Plants is completed: 32.4 MLD of Guheshwori WWTP at Kathmandu Metropolitan city, 14.2 MLD  of   Sallaghari WWTP at Bhaktapur Municipality, 17.5 MLD of Kodku WWTP at Lalitpur Sub- Metropolitan City and 37 MLD of Dhobi hat WWTP at Lalitpur Sub – Metropolitan   City   with   Total   Estimated Cost of 95.69 million US$

·   Preparation of Detailed Design, Cost Estimate and Bidding Documents for Construction Package of Interceptor Sewer Laying Along Hanumante and Manohara River of about 37 km of interceptor length varying from 400mm dia to 1500mm dia with total estimated cost of 23.107 million US$ in completed (The packages are under the bidding process)

·   Preparation of Design and Bidding Documents for other component of the project is undergoing.

The updating of IEE documents are resettlement plan document are prepared.

-->