· Preparation of DPR, Cost Estimate and Bidding Document of Design Build and Operate contract for 4 numbers of Wastewater Treatment Plants is completed: 32.4 MLD of Guheshwori WWTP at Kathmandu Metropolitan city, 14.2 MLD of Sallaghari WWTP at Bhaktapur Municipality, 17.5 MLD of Kodku WWTP at Lalitpur Sub- Metropolitan City and 37 MLD of Dhobi hat WWTP at Lalitpur Sub – Metropolitan City with Total Estimated Cost of 95.69 million US$
· Preparation of Detailed Design, Cost Estimate and Bidding Documents for Construction Package of Interceptor Sewer Laying Along Hanumante and Manohara River of about 37 km of interceptor length varying from 400mm dia to 1500mm dia with total estimated cost of 23.107 million US$ in completed (The packages are under the bidding process)
· Preparation of Design and Bidding Documents for other component of the project is undergoing.
The updating of IEE documents are resettlement plan document are prepared.
· Preparation of Detailed Design, Cost Estimate and Bidding Documents for Construction Package of Interceptor Sewer Laying Along Hanumante and Manohara River of about 37 km of interceptor length varying from 400mm dia to 1500mm dia with total estimated cost of 23.107 million US$ in completed (The packages are under the bidding process)
· Preparation of Design and Bidding Documents for other component of the project is undergoing.
The updating of IEE documents are resettlement plan document are prepared.
-->