Master Planning, Review of PPTA study Report, Topographical survey, Total Station Survey, alignment survey, traverses survey Feasibility study, Soil Test and Geo–Technical Investigation, Financial and economic analysis (calculation IRR, EIRR, FIRR, Sensitive analysis) Feasibility study, detailed engineering survey, soil investigation, master planning, conceptual design, detailed architectural and engineering design, IEE/EIA, financial analysis (FSRR, AIFC, EIRR Socio economic survey, preparation of detailed working drawing, cost estimates, BOQ, specification, ICB tender document preparation, bid evaluation, Preparation of Procurement plan, Implementation Schedule, Water quality monitoring, water treatment requirements identification, Detailed design of water treatment plants, Storm water drainage design drawings, Perform economic and financial evaluation and recommend water tariff in consultation with TDF, make ensure that the tariff will be sufficient to cover full operation and maintenance cost, system expansion cost and the capital cost required to pay back the loan through TDF, Preparation of resettlement plan, Preparation of Grievance Redress Mechanism, Preparation of EMP and RAP, Preparation of GIS Mapping, Coordination with NGO for community awareness, Preparation of water Safety plan, Full time Project Management at PIU, Prepared standard construction management system PPMS with PIU to be followed by Contractor at construction sites. GESI Mainstreaming at PIU, Contract Management and administration, Construction Supervision includes Quality Monitoring, Environmental and Social Compliance Monitoring, On the Job Training to community, Construction Site Management and post construction monitoring .Submission of reports at design and supervision phases.(Inception Report, Monthly and Quarterly progress report, interim report, Annual progress report, Draft Final report and Final Report, Project completion Report), Assist PIU in matters related to project construction management and in post construction phase (DLP) of the water supply and sanitation and sewerage sub project, supplementary urban facilities. System expansion cost and the capital cost, Preparation of resettlement plan, Preparation of Grievance Redress Mechanism, Preparation of EMP, Coordination with NGO for community awareness, Preparation of water Safety plan, Full time Project Management at Municipality, Contract Management and administration, Construction Supervision includes Quality Monitoring, Environmental and Social Compliance Monitoring, Construction Site Management and post construction monitoring. Submission of reports at design and supervision phases. (Inception Report, Monthly and Quarterly progress report , Interim)