Preliminary Study for Indicative Plan and Programme, Preparation of Indicative Plan with lists of program and projects, Introductory Workshop, Stakeholder Consultative Workshops, Survey and design and Preparation of Reports for Pre-feasibility Studies, Feasibility Studies & Detailed Project Reports (DPR) of Roads and drainage, Water Supply, Bus park, Solid Waste management, Topographical survey, Soil Test and Geo-Technical Investigation, Financial and economic analysis (calculation FRR, EIRR, FIRR, Sensitive analysis), Socio economic survey, Preparation of detailed working drawing, GIS Mapping, cost estimates, BOQ, specification, etc.