Project Detail

Feasibility Study, Detailed Engineering Design and Construction Supervision of Urban and Environmental Improvement Project (UEIP), Hetauda Municipality (Funded by ADB loan No. 1966 NEP (SF).

 

Project Description

(i) Water Supply Sub-project (ICB-Contract): Detail engineering design and construction supervision of gravity flow water supply system / 3 nos. of overhead water tank, two nos. of ground water tank, 2 nos. of water treatment plant, stream intake, 2 nos. of deep boring, 75 km of distribution pipe line with DI, HDPE and GI of varying sizes of 300 mm to 40mm, financial and economic analysis etc. The total sub-project cost is Rs. 192,433,634.94

Main Town Scheme (This scheme serves ward no. 1, 2, 3, 4, 5 and 10): The sub-project includes the rehabilitation and extension of the existing water supply schemes to improve the overall water supply situation of the Hetauda Municipality. The scheme comprises detailed engineering survey, design and construction supervision of infiltration gallery, 500 m3 capacities ground tank, water treatment plant, transmission main, distribution pipe etc.

(ii)Sanitation & Sewerage Sub-project: It involves detail survey, design and construction supervision of three nos. of combined sewerage system, there are three schemes name as Rapti-1, Rapti-2 and Karra system of 13km length with 1500mm to 300 mm dia. RCC hume pipe with Waste Water (reed bed) treatment plants each on the banks or Rapti and Karra rivers serves wards 1, 2, 4, 5 and 10 of Hetauda Municipality. The sub-project includes construction of 3 nos. of sewerage system. The total sub-project cost is Rs. 145,080,402.83

(iii)Supply of Sewer Cleaning Equipment Sub-project: There are sewer cleanings equipment like jetting machine, suctions machine, di-silting machine, 2 nos. of tripper, one no. of tractor etc. The total sub-project cost is 17,495,878.14

(iv) Waste Water (Reed Bed) Treatment Plant Sub-project: It involves detail survey, design and construction supervision of three scheme of Waste Water (Reed Bed) Treatment Plant sub-project name as Rapti-1, Rapti-2 and Karra system. The total sub-project cost is Rs. 42,124,197.65

(v) River Training Works Sub-project (Rapti and Karra River Bank Protection Work): It involves detail survey, design and construction supervision of river embankments to protect against flood, erosion, from Rapti & Karra rivers in wards 1, 11 & 4 respectively. The total project cost is 9,168,350.37

(vi)  Supplementary Urban Facilities: The detailed design and construction supervision for: a) Small Urban Community Facilities and b) Revenue Generating Urban Facilities.

(a) Small Urban Community Facilities: It involves detail survey, architectural & structural design and construction supervision of 1 nos. of public toilets and 1 nos. of recreation park for children. The total project cost is Rs. 70,44,570.37

(b) Revenue Generating Urban Facilities:

Vegetable Market: It involves detail survey, architectural & structural design and construction supervision of vegetable market with shop with 63 stalls, storm water drainage, electric system, area coverage: 821.00 sqm, shopping stalls of various sizes, precast concrete blocks pavements, landscape and security protection works etc. The total sub-project cost is Rs. 11,035,947.22

Meat Market: It involves detail survey, architectural & structural design and construction supervision of meat market shop with 84 stalls, planning of outer shops for other retail goods, storm water drainage, electric system, area coverage: 3,019.50 sqm, shopping stalls of various sizes, precast concrete blocks pavements, road lightning, landscape and security protection works etc. The total sub-project cost is Rs. 22,059,859.14

Bus Park: It involves detail survey, design and construction supervision of Hetauda Bus Park with RCC pavement work, passengers waiting hall, 13 nos. of ticket selling counters, storm water drainage system, water supply system, busses parking area and electric system etc. The total sub-project cost is Rs. 9,847,062.99