Inner Page Header Image

Project Detail

Detailed Engineering Design, Drawings, Documentation, Institutional Support, IEE Study Report of Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP), ADB Loan No-2650 NEP (SF) Birgunj Sub-Metropolitan City,Nepal

 

Project Description

Wastewater Treatment Plant: Detail Survey and Design of10 MLD capacity pumping station, Anaerobic Ponds (2 Nos.) Facultative Ponds (2 Nos.), Drying Beds, Sludge Drying Bed (8 Nos.) Sump well for pumps, Grit chamber with 2 channels etc. Storm Water Drains: Detail Survey and Design of 53.461 km length brick masonry and R.C.C. storm water drains with outlets. Sewer Lines: Detail Survey and Design of 15.216 km length spigot type of R.C.C. Hume pipe and HDPE pipe sewers construction with Manholes, sewer inlets, Trunk Mains and secondary sewers works etc. Road and Lane Improvements including Road Reinstatement Works: Detail Survey and Design of 36.3 Km length road and lane improvements and reinstatement with all necessary black top works etc. Integrated Solid Waste Management (ISWM)