Project Detail

Detailed Engineering Design and Supervision Consultant for Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP) at Biratnagar Metropolitan City, Biratnagar

 

Project Description

§  Storm Water Drains: Masterplan,Detail Survey and Design of 32.69 km length brick masonry and R.C.C. storm water drains with outlet structures and syphon crossings works etc.

§  Sewer Lines: Masterplan, Detail Survey and Design of 43.37 km length spigot type of R.C.C. hume pipe (16.8 km) and HDPE pipe (47.2 km) trunk mains and secondary sewers works (sewer size 200 dia. to 1000 dia.) construction with Manholes, (2019 nos.), sewer inlets (3766 nos.), house connection (5930 nos.), etc.

§  Wastewater Treatment Plant: Detail Survey and Design of214 mld capacity pumping station, collection chamber (3 Nos.), bar screen (1 no.), oil & grease chamber (1 no.), grit chamber (1 no.), anaerobic ponds (3 Nos.) facultative ponds (3 Nos.), sludge drying beds, outfall structure, workshop, office cum-laboratory building, guard quarter, generator house, electricity transmission line, submersible pump and site development works etc.

§  Road upgrading and Improvements: Detail Survey and Design of 44.58 km length of bituminous road having width of 4m to 14m including pavement design

§  River training and Landscaping Works: Detail Survey, Design Estimate and Supervision of River training 25 Km, Landscaping and Beautification of 10 hectar area of Waste Water Treatment Plant (WWTP) area along Singhiya Riverbank

§  Storm Water Drains: Masterplan,Detail Survey and Design of 32.69 km length brick masonry and R.C.C. storm water drains with outlet structures and syphon crossings works etc.

§  Sewer Lines: Masterplan, Detail Survey and Design of 43.37 km length spigot type of R.C.C. hume pipe (16.8 km) and HDPE pipe (47.2 km) trunk mains and secondary sewers works (sewer size 200 dia. to 1000 dia.) construction with Manholes, (2019 nos.), sewer inlets (3766 nos.), house connection (5930 nos.), etc.

§  Wastewater Treatment Plant: Detail Survey and Design of214 mld capacity pumping station, collection chamber (3 Nos.), bar screen (1 no.), oil & grease chamber (1 no.), grit chamber (1 no.), anaerobic ponds (3 Nos.) facultative ponds (3 Nos.), sludge drying beds, outfall structure, workshop, office cum-laboratory building, guard quarter, generator house, electricity transmission line, submersible pump and site development works etc.

§  Road upgrading and Improvements: Detail Survey and Design of 44.58 km length of bituminous road having width of 4m to 14m including pavement design

§  River training and Landscaping Works: Detail Survey, Design Estimate and Supervision of River training 25 Km, Landscaping and Beautification of 10 hectar area of Waste Water Treatment Plant (WWTP) area along Singhiya Riverbank

-->