Construction Supervision for Regional Urban Development Project (RUDP), Drainage, Roads, Footpath, Road Furniture, By Pass Road, Bus Bays works for Birgunj Metropolitan City. ADB LoanNo. 3566-NEP (SF) and for remaining works of Integrated Solid Waste Management and Waste Water Treatment Plant of Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP)

 

Project Description

Narrative Description of Project:

Road and Lane Improvement: Supervision of Sub Grade, Sub Base course, Base Course, DBM and Asphalt concrete etc. for Single lane, double  lanes, four lane  roads with Drainage,  Footpath, Road Furniture, Street lightening of 18. 78 56 kms and  s ix   Iane 7.1064 Kms (By Pass Road highway).

Storm Water Drains: Supervision  with occasional Detailed survey, design  of  11.367 kms length brick masonry and R.C.C. Hume pipe (of diameter  300 mm to 1200  mm) storm water drains works etc.

Road Side Drains: Supervision with occasional Detailed survey, design of 16.246. kms length  brick masonry and R.C.C. Road side drains works etc.

Retaining (Toe) wall: Supervision with occasional Detailed survey, design of 10.358 kms length Retaining (Toe) wall works etc.

Footpath: Supervision with occasional Detailed survey, design of 65458 Sq.m.  Footpath works etc including interlock tiles.

Median: Supervision with occasional Detailed survey, design of 16193 Running Mtrs. Median works etc.

Minor Bridges: Design and Construction Supervision of three numbers of RCC minor Bridges, one on the six Jane By-pass roads and two on the Radhemai road.

Wastewater Treatment Plant10 MLD (Contract No. STIUEIP/W/BRJ/ICB-01): Supervision of  10 MLD capacity  of  Sump  well  with  pumping  station,  Diversion  chamber  (1  No.),  Bar  screen  chamber  (1   No.),   Grit Chamber (1 No.),  Anaerobic Ponds (2 Nos.),  Facultative  Ponds (2 Nos.),  Sludge Drying Bed (8 Nos.), Office cum Lab  building,  workshop  building,  guard  quarter,   generator and  changing  house,  24x7  Dedicated electricity feeder line, submersible pump  and site  development works etc.

Sewer Lines (Contract No. STIUEIP/W/BRJ/ICB-01): Maintenance  and  supervision of  7.811 km length HDPE pipes of  200   mm, 250 mm  diameter and  spigot  type of R.C.C. Hume   pipes of  300mm,450mrn,500mm,   &  800 mm  diameter    in  size   Sewerage system  with  Manholes,  sewer inlets,  House  Connection Chamber , Trunk Mains  and secondary  sewers  works etc.

Integrated Solid Waste Management (Landfill Site) Works (Contract No. STIUEIP/W/ BRJ/ICB-02): Supervision with occasional  Detailed survey, design of different components works including three waste disposal cells (Covering total area of 5 hactres); two Anaerobic Ponds, one Facultative Pond and one Maturation Pond for the treatment of leachate coming out of the cells, service roads within the premise of the site; erection and setting out of weighing bridge, shredding system for shredding the decomposable wastes used for composting; Operation and Maintenance of  the system  including  collection  and transportation  of  wastes  (up to 45  tons  per day) to the  site; segregation of the wastes as reusable for 3-R system, decomposable wastes for composting for the purpose of resource generation and inert wastes to the cells for sanitary refilling with due compaction etc.

Total Project Cost: NRs. 2,576,025,863.08

Description of Actual Services Provided in the assignment:

Assist the Municipality (Birgunj  Metropolitan City) in (i) Supervising overall project implementation and management, (ii) Construction management of the subprojects  i.e. improvement and development of drainage systems; and improvement of urban  roads and  lanes, (iii)  Ensuring  proper  monitoring  of  project activities,  and  (iv)  preparing specific  operation  and maintenance  plans for subprojects  (v)  Design of additional roads and  drainage projects and  design review of  roads and drainage and integrated solid waste management project (vi) Updating of Resettlement Plan and   Maintenance of Grievance Redress Mechanism (vii) Preparation of Environmental Management Plan (EMP) and Resettlement Action Plan (RAP) (Viii) Trainings for institutional strengthening and capacity development of the municipality (Birgunj Metropolitan City) in the following areas: project management and operation; institutional support under capacity development for  strengthening and establishing units responsible   for  sewerage/   drainage;   Project  Management;   GESI  Mainstreaming at  PIU;  Contract Management  and   administration;   Construction   Supervision   includes   quality   monitoring; environmental  and Social Compliance monitoring; On the  job  training to  community, Construction site Management; (ix) Submission of  reports at supervision  phases (Inception Report, Monthly and Quarterly progress report, interim report, Annual progress report, Draft Final  Report  and  Final  Report,  Project  Completion  Report)  (ix)Assist  PIU  in  matters  related  to  Project Construction Management and  in Post-Construction  Phase: Defect Notification  Period (DNP) and (x)  Operation  and  Maintenance  of Roads,  Storm  Drains,  Side  Service  Drains,  Integrated  Solid  Waste Management  (Landfill Site)  System, sanitation  and sewerage sub- project.