Road Projects
- Consultancy Services for Detailed Engineering Survey Design and Preparation of DPR and Construction of Bardibas – Jaleshwor Road (42.00 km).
- Consultancy Services for Detailed Engineering Survey Design and Preparation of DPR and Construction of Basabtapur _ Kathariya – Kawanigoth – Pipardi – Jaleshwor Road (29.00 km).
- Identification of Roads Feasibility Study Detailed Engineering Survey and Design and Preparation of DPR and Construction Supervision of Terai Urban Road: Rajbiraj, Malangawa, Siraha and Jaleshwor (60 km).
- Detailed Engineering Survey, DCP test, Design of Roads, Concise IEE and DPR Preparation of Sundarijal – Thakani – Mahankal – Helambu Melamchi (Kathmandu, Nuwakot, Sindhiplachowk) (55.00 km).
- Detailed Engineering Survey, DCP test, Design of Roads, Concise IEE and DPR Preparation of Chisapani – Dakarha – Chakamake – bashuntilping – chandibhanjyang – Nawalpurghat – palapu Road (Dhanusha 60.00 km).
- Detailed Engineering Survey, DCP test, Design of Roads, Concise IEE and DPR Preparation of Syaulebari – Lokil – Yarsa – Gosaikunda Road (31.00 km).
- Detailed Engineering Survey, DCP test, Design of Roads, Concise IEE and DPR Preparation of Madhutar – rotomate danda – Silame – Marin Khola Road (22.00 km).
- Detail Engineering Design of Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP), Birgunj Sub Metropolitan City ADB Loan No-2650 NEP (SF). Road upgrading and Improvements: Detail Survey and Design of 65 km length of bituminous road having width of 4m to 14m including pavement design.
- Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP).ADB Loan No-2650NEP (SF) Biratnagar Sub Metropolitan City, Nepal. Road and Lane Improvements including Road Reinstatement Works: Detail Survey and Design of 36.3 Km length road and lane improvements and reinstatement with all necessary black top works etc.
- Detailed Engineering Design Review and Construction Supervision of Melamchi Water Supply Sub-Project -2 ADB Finance Seven Contract Packages for Immediate Improvement Works: Contract No KUKL/ DSC – 01-ADB Finance. Urban Road Reinstate-36km, Paving of lanes-25 km.
Design and Supervision of Bagmati Area Physical Infrastructure Development Project:
- Project contract no : BASP 001/064-065(Location:Gokarna to Guheshwori, Municipal Trunk Sewer : 6 Km (300 mm to 800 mmdia), Metallic Road: 1.8 km, Asphalt Concreting: 8.00m wide)
- Project contract no : BASP 002/064-065 (Location:Tilganga to Sinamangal, Municipal Trunk Sewer : 2.019 km (400mm to 700 mm dia)Metallic Road:2.00 km, Asphalt Concreting: 8.00m wide)
- Project contract no : BASP 003/064-065 ( Location:Tilganga to Sinamangal, Municipal Trunk Sewer : 2.341 km (600 mm to 120 mm dia) Metallic Road: 2.00 km, Asphalt Concreting: 8.00m wide)
- Detail Engineering Survey & Design Work: Location:Minbhawan to Sankhamul, Municipal Trunk Sewer : 4.159 km to truck sewer of RCC Hume pipe (300 mm to 1200 mm dia) Metallic Road:4.00 km, Asphalt Concreting: 8.00m wide, Bio – engineering works: 9832 sqm
Detailed Engineering Design and Construction Supervision of Urban and Environmental Improvement Project (UEIP), Dhulikhel Municipality [ADB Loan No 1966 NEP (SF)]
- Pipal – Chaukot Road (1.56 Km), Pipalbot – Bhattendanda Road (1.52 km), Araniko Highway (Himalayan Horizon – Kuttal Road (1.92 km)
